Legislation Details

File #: 2026-425    Version: 1 Name:
Type: Miscellaneous Status: Agenda Ready
File created: 9/16/2026 In control: Board of Commissioners
On agenda: 10/15/2026 Final action:
Title: RESOLUTION OF SUPPORT REGARDING THE PROPOSED CONSTRUCTION OF A NEW AIRFIELD EQUIPMENT STORAGE FACILITY AT PIEDMONT TRIAD INTERNATIONAL AIRPORT
Attachments: 1. 2026.09.29_Purpose and Need_AESF to NCDOT, 2. Airfield Equipment Storage Building Sketch with Aerial
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
TITLE
Title
RESOLUTION OF SUPPORT REGARDING THE PROPOSED CONSTRUCTION OF A NEW AIRFIELD EQUIPMENT STORAGE FACILITY AT PIEDMONT TRIAD INTERNATIONAL AIRPORT
end

SPONSOR
Sponsor
Robin Keller
end

BACKGROUND
Background
The Piedmont Triad Airport Authority proposes to build a consolidated Airfield Equipment Storage Facility at Piedmont Triad International Airport. The facility would be on an approximately 9.3-acre site that would include:

- Three (3) tension fabric structures totaling approximately 44,000 square feet to house reserve Aircraft Rescue and Firefighting (ARFF) apparatus and equipment, airfield maintenance equipment and landscaping equipment;
- A covered salt storage facility to support winter snow and ice control operations;
- An equipment fueling station with two (2) 12,000-gallon aboveground storage tanks, one for diesel and one for gasoline, with secondary containment; and
- Associated pavement, drainage, lighting, utilities and security fencing.

The purpose of the facility is to provide a secure, weather-protected, centralized storage and support facilities for its ARFF, airfield maintenance and snow removal equipment. This would allow the airport to maintain operational readiness, meet its obligations under 14 CFR Part 139 and preserve the condition and service life of airport-owned equipment. The facility would protect the airport's investment in equipment, improve response times for snow removal and airfield maintenance, and improve environmental protection for material storage.

The NC Department of Transportation has committed more than $250,000 to the project, requiring a resolution of support from the Board of Commissioners. This project will not constitute a debt of the County, does not require a tax levy or pledge of the faith and credit of the county and will not affect the County's debt ratios or legal debt limit.
end

RESOLUTION
Resolution
WHEREAS N.C.G.S.ยง136-11.1 requires that the North Carolina Department of Transp...

Click here for full text